Project Name | Regent Residences |
Developer | Golden Villas Pte Ltd |
Architect | Ronnie Chin |
Site Area | 38,857 sqft |
No. Of Units | 180 Residential Units |
District | 12 |
Tenure | Freehold |
Expected TOP | 30th Sept 2016 |
Carpark | 180 lots (inclusive of 3 handicap lots) |
Unit Types |
1. FOUNDATION
Piling system to Engineer’s specification / BCA approval.
2. SUPERSTRUCTURE
Reinforced concrete and/or Pre-Stress Concrete and/or Precast Reinforced Concrete and/or Structural Steel to Engineer’s design and specification
3. WALLS
3.1 External Wall
– Reinforced concrete Walls and/or Masonry Walls
3.2 Internal Wall
– Masonry Walls and/or Cast In-Situ Reinforced Concrete Wall and/or Dry Wall Partition System and/or Light Weight Concrete Panels/ blocks
4. ROOF
4.1 Flat Roof
– Reinforced concrete roof with appropriate roofing system
4.2 Pitched Roof
– Reinforced Concrete roof or Clay roof tiles and/or Metal roof with appropriate insulation
5. CEILING:
5.1 Apartments
i. Living / Dining / Bedrooms / Study
– Skim coat and/or Plaster ceiling boards and/or bulkheads to designated areas with paint finish
ii. Yard
– Skim coat with paint finish
iii. Master Bathroom / Common Bathrooms & Kitchen
– Moisture Resistant Plaster ceiling boards and/or bulkheads to designated areas with paint finish
5.2 Common Areas
i. Lift Lobbies and Gymnasium
– Skim coat and/or Plaster ceiling boards and/or bulkheads to designated areas with paint finish
ii. Multi Storey Carpark, Staircase and other areas
– Skim coat with paint finish
6. FINISHES
6.1 Wall (For Apartments)
i. Living / Dining / Bedrooms / Study
– Cement and Sand Plaster and/or Skim Coat with paint finish and on exposed surface only
ii. Common Bathrooms / Kitchen
– Imported Tiles up to ceiling height and on exposed surface only
iii. Master Bathroom
– Marble or Compressed Marble Tiles up to ceiling height and on exposed surface only
6.2 Wall (For common areas)
i. Main Lift lobby
– Granite and/or Compressed Marble and/or Tiles and/ or Plaster Finish and/or Skim coat with paint finish
ii. Typical lift lobby
– Imported Tiles up to false ceiling height and/or cement and sand plaster with paint finish
iii. Gymnasium, Staircases, Corridor
– Cement and sand plaster with emulsion paint
iv. External wall
– Cement and sand plaster with textured coating and/or paint finishes
6.3 Floor (For Apartments)
i. Living / Dining
– Marble or Compressed Marble tile with skirting
ii. Bedrooms
– Timber and or Engineered Timber strips with skirting
iii. Master bathroom
– Marble or Compressed Marble tile
iv. Common Bathrooms, Kitchen, Yard, Balcony,
– Imported Tiles
v. Penthouse Staircase
– Imported Tiles and/or composite timber finish
vi. Roof Terrace Garden
– Imported Tiles and/or composite timber finishes
6.4 Floor (Common Areas)
i. Main Lift lobby
– Granite and/or Compressed Marble and/or Tiles
ii. Typical Lift Lobby, Corridors
– Imported Tiles
iii. Staircases,
– Cement and Sand Screed
iv. Pool Deck, BBQ Area and Communal Area
– Imported Tiles and/or Pebble wash and/or stone and/or composite timber fi nish
v. Lap Pool, Wading Pool, Jacuzzi
– Mosaic Tiles
vi. Children Playground / Zone
– EPDM Granulated Rubber Flooring
7. WINDOWS
Powder coated aluminium or equivalent glazed framed windows.
8. DOORS
8.1 Main Entrance
– Approved Fire-rated timber door
8.2 Bedrooms, Bathrooms, Kitchen
– Hollow core timber door
8.3 Balcony
– Aluminium framed glass door
8.4 Roof Garden
– Hollow core timber door and/or Aluminium Framed Door
8.5 Household Shelter
– PSB approved blast door
9. IRONMONGERY
Good quality locksets and ironmongery to be provided to all doors
10. OTHERS
10.1 Balcony/ Roof Terrace
– Laminated Glass Railing and/or Reinforced Concrete Parapet Wall
10.2 Internal Unit Staircase
– Imported Tiles/Engineered Timber fl ooring with glass railing and/or metal railing and/or timber handrail
11. SANITARY FITTINGS
11.1 Master Bathroom / Common Bathroom
i. 1 shower cubicle complete with shower mixer and shower set
ii. 1 wash basin and basin mixer
iii. 1 mirror
iv. 1 toilet paper holder
v. 1 towel rail
vi. 1 vanity cabinet and/or shelves
vii. 1 water closet
11.2 Kitchen
– One stainless steel sink with mixer
12. ELECTRICAL INSTALLATION
12.1 Electrical Wiring below false ceiling within the units shall generally be concealed where possible. Electrical wiring above ceilings and main entrance corridor shall be in exposed trays and/or conduits and/or trunking
12.2 Refer to Electrical Schedule
13. TV/FM/Telephone
Refer to Electrical Schedule for details.
14. LIGHTNING PROTECTION
Lightning Protection System shall be provided in accordance with the Singapore Standard CP33 1996
15. PAINTING
15.1 Internal Walls
– Paint Finish
15.2 External Walls
– Weather seal paint and/or spray textured coating to designated area
16. WATERPROOFING
Waterproofing to floors of Bathrooms, Kitchen, Roof Garden, Planter Box, Balcony, Reinforced Concrete Roofs, Swimming Pools and where applicable
17. DRIVEWAY AND CARPARK
17.1 Surface Driveway
– Concrete pavers and/or tarmac and/or reinforced concrete
17.2 Multi-Storey Carpark/Driveway
– Reinforced Concrete
18. RECREATIONAL FACILITIES
Lush 2nd Storey Sky Terrace with
– 50m Infinity Lap Pool
– Jacuzzi Dip Pool
– Lounge Pool
– Wading / Fun Pool
– Sky Terrace and Sun Deck
– Pool Deck
– BBQ Pavilion
– Outdoor Wellness and Fitness Corner
– Indoor Gymnasium
– Steam Room
– Changing Room
– Club House
– Children’s Play Zone
– Shower Area
Lush 14th Storey Sky Terrace with
– City Viewing Gallery/Lounge
– Dining cum BBQ Pavilion
– Leisure Lounge
– Entertainment cum BBQ Pavilion
– Reflective Pool
– Hydro Therapy Pool
– Wellness and Fitness Corner
– Lawn and Putting Green
– Rise and Shine Pavilion
– Landscape Garden
19. SOIL TREATMENT
Anti Termite soil treatment by specialist, where applicable
20. ADDITIONAL ITEMS
20.1 Kitchen Cabinets / Appliances
– Built in Kitchen cabinets with solid surface worktop complete with sink and mixer, cooker hood and hob
20.2 Fridge
– Free Built in Fridge or free standing fridge
20.3 Wardrobes
– Quality wardrobes provided to all bedrooms (2400 Height)
20.4 Air-conditioner
– Split Unit Air conditioning System to Living / Dining , Study and Bedrooms
20.5 Intercom System
– Intercom System between 1st Storey/common lift lobby , Visitor call panels and apartment
20.6 Hot water Supply
– Hot water supply to Kitchen and Bathroom
20.7 Security System
– Proximity access card to 1st Storey and carpark lift lobby
– Closed Circuit Television System (CCTV) surveillance camera to 1st storey Lift
– Lobby and designated common area
Notes
1. Granite and marble are natural stone materials containing veins with tonality differences. There will be colour and markings caused by their complex mineral composition and incorporated impurities. While such materials can be pre-selected before installation, this non-conformity in the marble or granite cannot be totally avoided. Granite tiles are pre-polished before laying and care has been taken for their installation. However, granite being a much harder material than marble cannot be re-polished after installation. Hence, some differences may be felt at the joints.
2. Timber strips are natural material containing veins and tonal differences. Thus it is not possible to achieve total consistency of colour and grain in their selection and installation.
3. The Purchaser is liable to pay annual fee, subscription fee and such other fees to the Singapore Cable Vision Ltd (SCV) or Mio TV or any other relevant authorities. The Vendor is not responsible to make arrangements with any of the said parties for the service connection for their respective subscription channels.
4. Layout/location of wardrobes, kitchen cabinets and fan coil units, electrical points, door swing positions and plaster ceiling boards are subject to Architect’s sole discretion and final design.
5. Where warranties are given by the manufacturers and/or contractors and/or suppliers of any equipments and/or appliances installed by the Vendor at the Unit, the Vendor shall assign to the Purchaser such warranties at the time when possession of the Unit is delivered to the Purchaser. The Vendor shall not be answerable for any failure of these manufacturers and/or contractors and/or suppliers to
honour any warranty.
6. Air-conditioning system has to be maintained by the Purchaser on a regular basis. This includes the cleaning of filters, clearing the condensate pipes which are essential for the efficient running and prolonging the operating life of the system.
7. All recreational facilities are subject to change/ approval by the relevant authorities and/or technical requirements/compliance.
8. Whilst every reasonable care has been taken in preparing this website, the developer and its agents cannot be held responsible for any inaccuracies. All statements are believed to be correct but are not to be regarded as statements or representations of fact.
9. All information and specifications are current at the time of going to press and are subject to change as may be required and cannot form part of the contract. All plans are subject to any amendments approved or may be approved by the relevant authority. Visual representations including (architectural) models, drawings, photographs/pictures and artists’ renderings are impression only, while illustrations of interiors are only decor suggestions and none to be regarded as representation facts. Floor areas are approximate measurements and subject to final survey.
10. The Sales & Purchase Agreement shall form the entire agreement between the Developer and the Purchaser and shall supersede all statements, representations or promises made prior to the signing of the Sale & Purchase Agreement and shall in no way be modified by any statements, representation or promises made by the developer or the marketing agent.